Skip to main content

M6: Repairs and Maintenance

Question for Department for Transport

UIN 751, tabled on 11 May 2022

To ask the Secretary of State for Transport, whether Highways England will make the traffic reports and studies taken to produce the design of the connection at Junction 11 on the M6 link road available to the public.

Answered on

18 May 2022

The traffic reports and studies that informed the design of the M54 to M6 Link road scheme have been made publicly available on both National Highways’ website and the Planning Inspectorate’s website.

The Scheme Assessment Report which details the appraisal of options and informed the Preferred Route Announcement can be found here: https://highwaysengland.citizenspace.com/he/m54-to-m6-m6-toll-link-road/results/schemeassessmentreport.pdf.

The Scheme Assessment Report that was submitted as part of the scheme’s Development Consent order application, along with the Transport Assessment Report, can be found here: https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010054/TR010054-000335-TR010054%20M54%207.4%20Transport%20Assessment%20Report.pdf.

The Transport Assessment Report was updated as part of the DCO application and that can also be found on the Planning Inspectorate’s website: https://infrastructure.planninginspectorate.gov.uk/wp-content/ipc/uploads/projects/TR010054/TR010054-000727-7.4%20P06%20Transport%20Assessment%20Report%20clean%20(1).pdf.