Skip to main content

High Speed 2 Railway Line: Eddisbury

Question for Department for Transport

UIN 35401, tabled on 25 April 2016

To ask the Secretary of State for Transport, what research HS2 Ltd has (a) produced and (b) commissioned on the geological effect of the construction and operation of High Speed 2 in Eddisbury constituency.

Answered on

4 May 2016

HS2 Ltd has commissioned from a mining engineer (in consultation with the Cheshire Brine Subsidence Compensation Board) a study of the saltfield, which applies to Cheshire including the Eddisbury constituency.

HS2 Ltd. has commissioned from Heriot-Watt University a modelling of the geodynamic effects of high speed railway operation, which applies route wide including the Eddisbury constituency.